A Multi Time-Scale Robust Aggregation Model for Virtual Power Plant Based on Rolling Correction

Haotian Zhao,Xuanyuan Wang,Bin Wang,Bo Ning,Hongbin Sun,Zhen Liu,Zhaoguang Pan
DOI: https://doi.org/10.1109/ei256261.2022.10116634
2022-01-01
Abstract:Virtual power plant (VPP) is an effective solution for the aggregation of distributed resources. To exploit the flexibility inside distributed resources, a multi time-scale robust aggregation Model is proposed in this paper. A day-ahead robust aggregation model based on robust optimization is proposed to formulate a robust feasible region of the VPP. Based on the day-ahead aggregation model, the VPP updates its aggregation model at the next dispatch period according to the latest information to reach a compromise between robustness and economy. The robust optimization problem is solved by an iterative heuristic methodology based on the column-and-constraint generation algorithm. Results from a case study demonstrate that the proposed multi time-scale aggregation method is satisfactory in both precision and calculation speed.
What problem does this paper attempt to address?