Research on the Deformation of the Bridge Piles Foundation Due to Overlapping Tunnel Excavation

LU Li-jun
2012-01-01
Abstract:Based on the under-construction Metro Line 4 and 6 of Wuhan,an FLAC two-dimensional numerical model was established and the deformation of the railway-bridge pile foundation caused by different loss rates of stratum and excavation sequences of shield tunnel was studied profoundly.According to the results of numerical simulation,when the loss rate of stratum is between 0.2% and 1.5%,the deformation satisfies the safety requirements.However,when the rate is greater than 1.5%,measures must be taken to control the deformation of the railway-bridge pile foundation and the pre-reinforcement of soil around the tunnel is a recommended way.