Application of Performance Contracting in a Mall in Xiamen

Weiding Long
2011-01-01
Abstract:Describes the application of performance contracting in a mall in Xiamen,analyzes the energy saving potential of the shopping center in cold source,water system and lighting based on its historical energy consumption data,points out that the air conditioning system can't produce cooling according to the actual load,the flow of water pump can't match that of chiller,the lighting is inefficient,proposes the energy-saving solutions and energy-saving calculation method for each section.Especially for the energy saving calculation methods of centrifugal chillers with VSD(Variable Speed Driver),gives that the energy saving of centrifugal chillers with VSD in partial load is about 20%.