The Control Project Research and Design about the Landslide of Xiyuan Building Materials Factory at Xishanping, Chongqing
魏作安,万玲,贺建波,张东明
DOI: https://doi.org/10.3969/j.issn.1003-8035.2004.03.004
2004-01-01
Abstract:Based on the geo-technical data of landsslide in Xiyuan Building Material Factory at Xishanping, the composition of rock and soil bed of the landslide is gotten, the physical and mechanical characteristics about rock and soil, such as density, shear strength etc. are tested, the reason which caused the landslide is found. Besides the property of rock and soil bed, hydrogeological condition, cutting the slope toe and unearthing for building are the main reason to make the slone slide. The mechanism and the type about the landslide are also obtaind, and qualitatively called it a new small shallow drawing soil landslide. Through using the limit-eqyuilibrium method which is recommended in the code of controlling landslide, the stability analysis of the landslide is overall done, the stability coefficients for three geologic sections (A-A',B-B',C-C') of the landslide are calculated. The stability coefficient is only 0.99~1.03 in the condition of self-weight and torrential rain and earthquake that is the most disadvantageous condition,the slope is in unstalbe condition and the situation is very dangerous. According to the result of the slope stability calculation, the code for controlling landslide in the area of the Three Gorges on the Yangtze River, and the design principle which includes that the technique is possible, reliable and safe, the project cost is reasonable, the project is simple and easy to construct, an emergency and rush dealing control project to the landslide is designed, which is a synthetic project including resistance piles. The resistance piles are main measure, drainage of rain water from the top of slope and filling up and pressing the rifts with soil on the slope face are also taken. The resistance piles are set in a line and according to different condition they are divided into three sections.There are thirteen piles,the dimensions of pile are determined according to the quantity of surplus slide force. There are two types which are 12.0?m×1.80?m×1.20?m(length×width×height) from No.1 to No.4 and No.10 to No.13, and 13.0?m×2.00?m×1.50?m(length×width×height) from No.5 to No.9. After the controlling project is finished, the safety coefficient of the slope would get to the safety standard under different condition, the landslide disaster would be eliminated. The porject has been checked and passed by experts from controlling landslide disasters in the area of the Three Gorges on the Yangtze River. Up to date the project is in the phase of prepared construction.