Investigation and Rehabilitation of Lining Imperfections and Cracks in an Operating Railway Tunnel

Junsheng Yang,Junwei Fu
2015-01-01
Abstract:The X.Z.Y. tunnel is a curved tunnel with single-rail track for the railway in southwest China. The construction was started in April 2003 and completed in August 2004. The tunnel crosses a hills area where the excavation was in a stratum of mudstone mixed with sand stone. The stratum was formed horizontally with developed joints. The tunnel was constructed using the conventional tunnelling method with an integral lining system. During the operation, in March 2014, a inspection shows that the tunnel lining was found severe damaged and fractured in wide range sections. In typical damaged section, the tunnel lining was cracked symmetrically at the springline due to bulge and broke at the crown in a compression way. Similar trends were observed in other sections of the tunnel lining system. Nondestructive detection test shows that there were cavities and incompacted areas behind the tunnel lining. In this paper, a systematic method was proposed to rehabilitate the lining sections where the lining was fractured or showed a trend of fracture. Such method was based on a reinforced shotcrete technology together with anchors for fixation in the application. Numerical analysis was carried out to investigate the mechanical performance of the tunnel lining damage. Field investigation were conducted to monitoring the effectiveness of the applied measures. The results show a good performance of using the reinforced shotcrete for the rehabilitation of tunnel lining fracture.
What problem does this paper attempt to address?