Research on wind resistance and windbreak design for Beijing 2022 Olympic Winter Games facilities in Yanqing

LI Bo,LIU Kun,NA Ling,LIU Wenting,TIAN Yuji,CHEN Ping,BAI Fan
DOI: https://doi.org/10.19701/j.jzjg.20221403
2023-01-01
Abstract:The windbreak of the downhill track is the key to ensure that Olympic Winter Games can be held on schedule. Based on the monitoring data of meteorological stations, the analysis of meteorological observation wind speed in Yanqing Competition Area of Beijing Olympic Winter Games was carried out firstly by using the independent storm method, and the wind speed of 50-year return periods at the meteorological observation positions was obtain. Thereafter, the wind environment wind tunnel test for Yanqing Competition Area was carried out, the wind speed proportional relationship between the meteorological station and the competition area buildings was obtained. The design wind pressure of the key positions in the competition area with a return period of 50-year return was given. Then, the wind tunnel test of National Sliding Center was carried out by using the segmen model, and the shape coefficient required for the main structure design and the extreme wind pressure coefficient required for the envelope design were obtained. The wind environment of the downhill track of National Alpine Skiing Center was evaluated during the race, and the windbreak performance parameters of the windbreak wall of the ski track were obtained through the wind tunnel test, which were directly applied to the windbreak design of the downhill track. The results show that only 1 day of the event in Yanqing Competition Area was postponed to the next day, and other events were held on the planned day. The installation of the windbreak wall ensured the smooth progress of the alpine skiing event in Olympic Winter Games.
What problem does this paper attempt to address?