Rapid Start-up and Denitrifying Phosphorus Removal Characteristics of A2/O + MBBR Process
ZHANG Miao,HE Chengda,WANG Shuying,ZHANG Jianhua,WU Jun,PENG Yongzhen
DOI: https://doi.org/10.15961/j.jsuese.201601151
2017-01-01
Abstract:A two-sludge system of A2/O + moving bed biofilm reactor (A2/O + MBBR),used to treat wastewater with low carbon/nitrogen (C/N) ratio,was applied to investigate the sludge characteristics and denitrifying phosphorus removal characteristics during the start-up process,and rapid start-up strategy of the system was established based on the metabolic mechanism of nitrogen and phosphorus removals.The results showed that the start-up process was completed by 21 d,the sludge structure was stable with promising sludge settleability and biological activity.The average sludge concentration increased from 1 189 mg/L to 1 760 mg/L,SVI value was below 95 mL/gMLSS,and the percentage of denitrifying phosphorus accumulating organisms (DNPAOs) accounted for phosphorus accumulating organisms (PAOs) increased from 10.87% in inoculation sludge to 25.46%.During the start-up process,COD removal was basically stable and A2/O reactor achieved the efficient utilization of carbon sources.Nitrification process provided electron acceptors for denitrifying phosphorusremoval,and the high-efficiency removal of TN should build on the complete NH4-N oxidation.A close correlation between NO3--N and PO34--P removals was revealed.In addition to the simultaneous nitrogen and phosphorus removals in anoxic zone,aerobic phosphorus absorption played an important role in keeping stable effluent PO34--P under the operation condition with average influent C/N ratio of 3.44,COD,TN and PO34--P removals reached to 82.23%,74.72% and 96.80%,respectively,and the effluent concentrations of COD,NH4+-N,TN and PO34--P were 38.5,1.15,14.2,0.15 mg/L during the stable operation stage,which showed that the A2/O + MBBR system achieved high-efficient removals of organic matter,nitrogen and phosphorus simultaneously.Where.The variations of real-time control parameters of DO,pH and ORP exhibited quantitative relationship with nitrogen and phosphorus removals.During the stable operation,anaerobic ORP value was-398 ~-336 mV,pH increased by 0.55 and ORP increased to-300 ~-175 mV in denitrification process,and pH decreased by 0.37 in nitrification process.ORP and pH intuitively reflected the denitrification process,and pH sensitively revealed the nitrification process.Real-time control parameters were beneficial to promote the rapid start-up and stable operation.