A Single Machine Group Scheduling Problem with Due Date Assignment and Position-Dependent Costs

Ying Chen,Yi Xu,Guiqing Zhang,Yongxi Cheng
DOI: https://doi.org/10.1142/s0217595923400079
2023-01-01
Asia-Pacific Journal of Operational Research
Abstract:In this paper, we study a single machine scheduling problem with due date assignment under a group technology environment. The due dates of jobs are assignable according to the following three methods: the common (CON) due date assignment, the slack (SLK) due date assignment, and the different (DIF) due date assignment. Our objective is to determine a group sequence and job sequences within all groups, together with a due date assignment, to minimize a total cost function including earliness, tardiness, due date assignment and flow time costs, in which all unit costs are different and position-dependent. We present a unified [Formula: see text] time algorithm to solve the problem for all the three due date assignment methods.
What problem does this paper attempt to address?