Study on engineering cost estimation based on cost-significant theory and BP neural network theory

Xing Li-ying
Abstract:Based on the reference to Chinese and foreign correlative theories and methods,this paper advances the model of cost estimation based on cost-significant theory and neural network theory.The cost-significant theory is put forward to solve the tedious operation issues by finding out significant items to simplify the operation difficulty of engineering cost estimates;then the back-propagation neural network model is made up according to the BP algorithm to"distill"CSIs and csf(cost significant factor)from the data and information of completed projects,which provides a practical solution for those problems according to the nonlinear theory.The basic theories of BPNN and CS are introduced and their applications are illustrated with an example.For example,we can see that the relative errors are so small that they can meet the accuracy demand of cost estimations after simulation.The result shows that the model based on cost-significant theory and neural network theory is accurate and successful.
Engineering,Computer Science
What problem does this paper attempt to address?