Scheduling a Permutation Flow Shop in the Context of Industry 4.0.

Yaping Fu,Yushuang Hou,Xiwang Guo,Liang Qi,Hongfeng Wang
DOI: https://doi.org/10.1109/icnsc55942.2022.10004121
2022-01-01
Abstract:Industry 4.0 has attracted much concern in recent years, and Industry 4.0-based manufacturing systems have been widely employed in industrial areas. Processing quality is seen as an important objective in a manufacturing process because it greatly affects operation cost and reliability. This work aims to schedule a permutation flow shop such that processing quality of jobs is maximized while meeting makespan requirements. To cope with this problem, a two-stage hybrid shuffled frog-leaping algorithm is developed. Its first stage applies five crossover methods to produce new solutions adaptively, and second one generates new solutions by employing a probability matrix constructed based on the information found in its search process. By carrying out simulations and comparing it with the CPLEX, genetic algorithm, harmony search and differential evolution, this work concludes that it performs well in handling the newly formulated problem in the context of Industry 4.0.
What problem does this paper attempt to address?