Task Scheduling Via Modified Deep Reinforcement Learning for MEC-Enabled Industrial IoT

Yizhou Wang,Haixia Zhang,Xiaotian Zhou,Dongyang Li,Dongfeng Yuan
DOI: https://doi.org/10.1109/wcsp55476.2022.10039332
2022-01-01
Abstract:With the development of Industrial Internet of Things (IIoT), the ever growing mismatch between the numerous tasks generated in real industrial scenarios and the limited computing ability is enlarging the system delay. How to schedule the system tasks to enhance the system efficiency has become extremely significant. Along this line, a task scheduling scheme for MEC-enabled IIoT systems is proposed in this work to minimize the total delay of the whole system. Since there exist time overlaps between different tasks while the tasks are conducted in parallel, it is difficult to accurately model the process of the tasks in terms of delay. To solve this, a novel modeling method is proposed to transform the optimization problem of minimizing the total delay into minimizing the unprocessed data volumes. To solve the formulated problem, we formulate the process of the tasks being executed as a Markov decision process (MDP) and propose a modified deep reinforcement learning (DRL) algorithm. To evaluate the performance of our proposed task scheduling scheme, intensive experiments have been conducted. The results show that our proposed scheme achieves better performance than some existing schemes. In the end, the scalability and availability of our scheme are tested.
What problem does this paper attempt to address?