DQN-based online scheduling algorithm for hybrid flow shop to minimize the total tardiness

Xinrong Wang,Tieke Li,Bailin Wang,Wenxin Zhang
DOI: https://doi.org/10.1109/ISCID56505.2022.00022
2022-01-01
Abstract:Aiming at the hybrid flow shop scheduling problem with dynamic order arrival, a Deep-Q-Network(DQN) online scheduling method based on scheduling rules is proposed. In order to cope with the continuous production state and learn the most appropriate actions at each scheduling point, with the goal of minimizing the total tardiness, combined with classical scheduling rules, it is used to select jobs and assign them to feasible machines when each job is completed or a new job arrives, and extract 7 state features to represent the production state of the scheduling point. Numerical experiments are carried out on a large number of different production configurations. Experimental results show that DQN has advantages and versatility compared with single scheduling rules and Q-learning.
What problem does this paper attempt to address?