Premium Power Supply Scheme Based on Leasing Mitigation Equipment Against Voltage Sag

Heqi Zhao,Ying Wang,Xianyong Xiao
DOI: https://doi.org/10.1016/j.ijepes.2022.108757
IF: 5.659
2023-01-01
International Journal of Electrical Power & Energy Systems
Abstract:Small and medium-sized sensitive users are eager to have premium power supply. The common solution is purchasing mitigation equipment (ME). However, some of they have the financial pressure that cannot afford the mitigation. In order to solve this problem, this paper proposes a premium power supply scheme based on leasing mitigation equipment against voltage sag (PSLM). First, the scheme of PSLM is proposed, which consists of stakeholders, leasing modes and leased property. Second, this paper presents an algorithm of sensitive equipment (SE) trip probability considering effect of ME, to calculate trip probability of SE when it is equipped with ME, which reflects the mitigation effect that is related to profits of scheme. Then technical parameters of ME are optimized by an optimal configuration model, considering tolerance of SE under voltage sag. The cost of the scheme is determined by the optimization of technical parameters of ME. Furthermore, this paper proposes a calculation model of rental of PSLM, to maximize the revenues of both stakeholders. Non-dominated sorting genetic algorithm-II is used to solve the proposed two models. Finally, the effectiveness and feasibility of the proposed PSLM is verified by a case study of a grain oil manufacturer in the south China.
What problem does this paper attempt to address?