Full life cycle efficiency intelligent evaluation model and calculation of the hydropower unit

Xiaoliang Li,Zhongjie Huang,Xiaojun Wang,Chongwei Li,Kangde Wang,Ze Chen,Tao Yu
DOI: https://doi.org/10.1145/3558819.3565123
2022-01-01
Abstract:In order to improve the Full life cycle management level of hydropower units, solve the problems of complex power equipment efficiency evaluation model, difficult time scale introduction, and inability to link with actual operation and maintenance. This paper studies the effect of fatigue maintenance on real-time efficiency, improve ADC performance evaluation method, compare the efficiency evaluation model of hydropower model with the traditional ADC model, evaluate the model, and provide reference and real-time performance evaluation of other power equipment.
What problem does this paper attempt to address?