Application of Material Distribution Programming for Mixed-model Assembly Line Based on Direct-supply Kanban System

Li Yanchao,Tu Nan
DOI: https://doi.org/10.3969/j.issn.1005-152X.2014.03.129
2014-01-01
Abstract:In this paper, in view of the problems in the mixed-model assembly line of a Company A, we used the 5W3H process to propose a solution based on the direct-supply kanban system, reengineered the process of the assembly line on the aspects of material flow, information flow and capital flow and at the end, through an empirical study, demonstrated that the process could relieve the occupied warehouse space of the multi-model small-batch manufacturing enterprises and improve their production efficiency.
What problem does this paper attempt to address?