An Effective Two-Stage Iterated Greedy Algorithm to Minimize Total Tardiness for the Distributed Flowshop Group Scheduling Problem.

Zhi-Yuan Wang,Quan-Ke Pan,Liang Gao,Yu -Long Wang
DOI: https://doi.org/10.1016/j.swevo.2022.101143
IF: 10.267
2022-01-01
Swarm and Evolutionary Computation
Abstract:This paper aims to minimize the total tardiness for a distributed flowshop group scheduling problem with sequence-dependent setup time, which is an extension of the traditional distributed flowshop scheduling problem and has significant applications in the practical manufacturing environment. A mathematical model is set up and an effective two-stage iterated greedy (TIG) algorithm with an elaborately designed two-stage structure is pre-sented to address the considered problem. A heuristic method combining a problem-specific dispatching rule and a simplified tie-breaking method is designed to generate an initial solution. A novel reconstruction mechanism is developed to explore the most valuable search space to save the evaluation efforts. To validate the effectiveness of the proposed TIG, comprehensive computational and statistical experiments are conducted. Experimental results show that the proposed TIG outperforms the six state-of-the-art algorithms from the closely related literature by a considerable margin in terms of the relative deviation index values at the same maximum elapsed CPU time.
What problem does this paper attempt to address?