Sequential prediction of TBM penetration rate using a gradient boosted regression tree during tunneling

Hang-Lo Lee,Ki-Il Song,Chongchong Qi,Kyoung-Yul Kim
DOI: https://doi.org/10.12989/gae.2022.29.5.523
IF: 3.2
2022-01-01
Geomechanics and Engineering
Abstract:Several prediction model of penetration rate (PR) of tunnel boring machines (TBMs) have been focused on applying to design stage. In construction stage, however, the expected PR and its trends are changed during tunneling owing to TBM excavation skills and the gap between the investigated and actual geological conditions. Monitoring the PR during tunneling is crucial to rescheduling the excavation plan in real-time. This study proposes a sequential prediction method applicable in the construction stage. Geological and TBM operating data are collected from Gunpo cable tunnel in Korea, and preprocessed through normalization and augmentation. The results show that the sequential prediction for 1 ring unit prediction distance (UPD) is R-2 >= 0.79; whereas, a one-step prediction is R-2 <= 0.30. In modeling algorithm, a gradient boosted regression tree (GBRT) outperformed a least square-based linear regression in sequential prediction method. For practical use, a simple equation between the R-2 and UPD is proposed. When UPD increases R-2 decreases exponentially; In particular, UPD at R-2 =0.60 is calculated as 28 rings using the equation. Such a time interval will provide enough time for decision-making Evidently, the UPD can be adjusted depending on other project and the R-2 value targeted by an operator. Therefore, a calculation process for the equation between the R-2 and UPD is addressed.
What problem does this paper attempt to address?