Brief Announcement: Nested Active-Time Scheduling

Nairen Cao,Jeremy T. Fineman,Shi Li,Julián Mestre,Katina Russell,Seeun William Umboh
DOI: https://doi.org/10.1145/3490148.3538554
2022-01-01
Abstract:ABSTRACTThe active-time scheduling problem considers the problem of scheduling preemptible jobs with windows (release times and deadlines) on a parallel machine that can schedule up to g jobs during each timestep. The goal in the active-time problem is to minimize the number of active steps, i.e., timesteps in which at least one job is scheduled. This paper presents a 9/5-approximation algorithm for a special case of the active-time scheduling problem in which job windows are laminar (nested). This result improves on the previous best 2-approximation for the general case.
What problem does this paper attempt to address?