Bridge Integrated Early Warning System Based on BIM Secondary Development

Yu Peng,Ming Li,Zheng Li,Tao Hu,Yangjun Xiao,Juan Wen,Yu Liu
DOI: https://doi.org/10.1145/3495018.3495307
2021-01-01
Abstract:It has become an industry consensus to actively promote the research and application of BIM technology in the field of bridge engineering. This paper mainly studies the bridge comprehensive early warning system based on BIM secondary development. This paper builds a bridge safety risk early warning model based on credibility measure and develops a BIM-based bridge safety risk early warning subsystem. Firstly, the overall framework of the bridge safety risk early warning subsystem is designed based on the information data transmission mode of the BIM integrated platform. Then, the secondary development is carried out based on the secondary development interface API to achieve the embedding of the security risk early warning model. And the reliability and stability of the subsystem are verified and analyzed in order to realize the automation and visualization of security risk early warning.
What problem does this paper attempt to address?