Moving Safety Evaluation of High-speed Train on Post-earthquake Bridge Utilizing Real-time Hybrid Simulation

Wei Guo,Yang Wang,Chen Zeng,Tao Wang,Quan Gu,Huimeng Zhou,Lingyu Zhou,Wenqi Hou
DOI: https://doi.org/10.1080/13632469.2021.1999869
2021-01-01
Journal of Earthquake Engineering
Abstract:This study aimed to provide an experimental evaluation method for train's moving safety on a post-earthquake bridge. First, an improved real-time hybrid simulation (RTHS) framework was constructed, based on utilizing the moving load superposition algorithm to solve the train-track-bridge interaction (TTBI) problem. An RTHS test was then conducted for the TTBI problem. The train model was tested using a shake table and was dynamically linked to the numerical substructure. A post-earthquake seven-span high-speed railway simply supported bridge was studied, in which earthquake-induced damage, such as stiffness reductions, residual displacements of piers, girder gap expansions, and pier settlements were all tested.
What problem does this paper attempt to address?