Risk-Constrained Day-Ahead Scheduling for Wind Power and Pumped Hydro Storage Based on Information-Gap Decision Theory

Wenjie Zhao,Meng Yang,Junhui Liu,Zhenli Deng,Mingkang He,Xiong Wu
DOI: https://doi.org/10.1109/ei252483.2021.9713283
2021-01-01
Abstract:In recent years, wind power and other renewable energy sources have been connected to the large-scale power grid. However, output power of the wind turbine is greatly affected by wind speed, resulting in strong variability and intermittence, with a certain degree of uncertainty. At the same time, due to the uncertainty of load demand in day-ahead scheduling, the power system scheduling model is changed from the deterministic model to the uncertain model. In this paper, Information-gap decision theory (IGDT) is employed to deal with the uncertainties from wind power and load demand. According to the risk preference of decision makers, a robustness model for risk-averse strategy and an opportunity model for risk-seek strategy are established for wind-powered pumped hydro storage system. Finally, the case study based on the improved IEEE-30 node system verifies the effectiveness of the IGDT-based model. The results indicate that scheduling plan and the maximum uncertainty acceptable to the system can be obtained on the premise of meeting expected costs.
What problem does this paper attempt to address?