An Effective Water Wave Optimization Algorithm with Problem-Specific Knowledge for the Distributed Assembly Blocking Flow-Shop Scheduling Problem

Fuqing Zhao,Dongqu Shao,Ling Wang,Tianpeng Xu,Ningning Zhu,Jonrinaldi
DOI: https://doi.org/10.1016/j.knosys.2022.108471
IF: 8.139
2022-01-01
Knowledge-Based Systems
Abstract:The distributed assembly blocking flow-shop scheduling problem (DABFSP), which is a promising area in modern supply chains and manufacturing systems, has attracted great attention from researchers and practitioners. However, minimizing the total tardiness in DABFSP has not captured much attention so far. For solving the DABFSP with the total tardiness criterion, a mixed integer linear programming method is utilized to model the problem, wherein the total tardiness during the production process and assembly process are optimized simultaneously. A constructive heuristic (KBNEH) and a water wave optimization algorithm with problem-specific knowledge (KWWO) are presented. KBNEH is designed by combining a new dispatching rule with an insertion-based improvement procedure to obtain solutions with high quality. In KWWO, effective technologies, such as the re-developed destruction–construction​ operator, four local search methods under the framework of the variable neighborhood search strategy (VNS), the path-relinking method are applied to improve the performance of the algorithm. Comprehensive numerical experiments based on 900 small-scale benchmark instances and 810 large-scale benchmark instances are conducted to evaluate the performance of the presented algorithm. The experimental results obtained by KWWO are 1 to 4 times better than those obtained by the other comparison algorithms, which demonstrate that the effectiveness of KWWO is superior to the compared state-of-the-art algorithms for the considered problem.
What problem does this paper attempt to address?