Capacity Configuration of Battery Energy Storage System for Photovoltaic Generation System Considering the High Chargerate

Li Jiaming,Qiao Ying,Liu Guojing,Lu Zongxiang
DOI: https://doi.org/10.1051/e3sconf/202018203003
2020-01-01
E3S Web of Conferences
Abstract:Battery energy storage system (BESS) is one of the important solutions to improve the accommodation of large-scale grid connected photovoltaic (PV) generation and increase its operation economy. However, the strong intra-day volatility and severe curtailment of PV power sets a high demand of BESS charge-rate that is a key factor in operation models but ignored in current planning researches. This paper proposes a BESS capacity configuration model for PV generation systems which takes BESS’s ability to (dis)charge exceeds its rated power into account. The best charge-rate and power & energy capacity of BESS are optimized by particle swarm optimization (PSO) algorithm. Through an analysis of the annual output statistics of PV power station in the northwest of China, the results show that when considering the high charge-rate of BESS, the optimal BESS capacity configuration rises and comprehensive income of the PV-BESS system will increase.
What problem does this paper attempt to address?