Information Gain-Based Inspection Scheduling for Fatigued Aircraft Components

You Ling,Isaac Asher,Liping Wang,Felipe Viana,Genghis Khan
DOI: https://doi.org/10.2514/6.2017-1565
2017-01-01
Abstract:Inspection and service in aerospace industry are traditionally scheduled at a fixedinterval basis, which is pre-defined by designers and regulations. With emerging sensor techniques and data analytics capability, the industry has moved towards the idea of adjusting service schedules based on current asset conditions and damage prognostics. In this paper, we propose an intelligent inspection scheduling approach that is based on maximizing the information gain per unit cost of future inspections. The information gain from a future inspection is quantified by a divergence metric, which measures the crack size distribution before and after incorporating the inspection data. We use a dynamic Bayesian network (DBN) to track and predict the fatigue crack growth of aging aircrafts, and to update the crack size distribution when inspection data are available. The most likely outcome/data from future inspections are also estimated in DBN. Here we choose DBN because it is capable of integrating heterogeneous sources of information to accurately quantify uncertainty, and offers support for real-time decision making in diagnostics and prognostics. The proposed approach is demonstrated in a numerical example, where we identify the optimal future inspection schedule and the number of repetitive crack detections during one inspection, which maximize information gain per dollar.
What problem does this paper attempt to address?