Power System Joint Energy and Reserve Scheduling Model Considering Variable Speed Pumped Hydro Storage for Mitigating Wind Curtailment

T. T. Zheng,Y. W. Li,P. W. Yang,X. L. Chen,R. Zheng,S. H. Miao,H. Ji,H. R. Yin
DOI: https://doi.org/10.1088/1755-1315/354/1/012081
2019-01-01
Abstract:The large-scale integration of wind power brings great challenges to power system secure and economic operation. In order to address this challenge, the variable speed pump storage hydropower plant (VS-PSHP) technology and demand response technology have addressed a lot attention. In this paper, the coordination of the thermal power generator, the wind power plant, the VS-PSHP and multi-type flexible loads are considered, and a day-ahead and real-time coordinated scheduling model are proposed. The proposed model can formulate the generation, contingency reserve and power distribution factor schedules simultaneously. Numerical simulation results indicate that the coordination of VS-PSHP and multi-type flexible loads can increase the system operation economic and mitigating the wind power curtailment. The results also show that the VS-PSHP is good at providing contingency reserve, and the participation of VS-PSHP can lead to a relatively lower total system operation cost compared to the participation of fixed speed pump storage hydropower plant (FS-PSHP).
What problem does this paper attempt to address?