Coordinated Planning Between Charging Facilities of Electric Vehicles and Concerned Distribution System Considering Random Risk Cost

Lei Guo,Fushuan Wen,Kewen Wang
DOI: https://doi.org/10.1109/sges51519.2020.00187
2020-01-01
Abstract:The popularization and applications of electric vehicles (EVs) are closely related to the convenience and economy of charging services, while the construction of charging facilities must coordinate the interests of users, charging facility owners and the power grid company concerned. In addition, the uncertainty associated with the number of available piles in charging stations caused by the failure rate of charging facilities must also be considered. In this context, a chance constrained goal programming (CCGP) model with good flexibility is first introduced to quantify the uncertainty caused by the failure rate of charging facilities as random risk cost of redundancy of charging facilities and charging users' loss. Secondly, the travel behavior of EV users is simulated dynamically to analyze the cost of charging detour and waiting time. Then a bi-level programming model is established with the minimum total social cost as the upper target and the minimum new capacity expansion cost of distribution system as the lower target. The location and capacity of charging station is calculated by the upper model, and the transformation scheme of distribution system is obtained by the lower model. Finally, the coupling system of 77 node traffic network and 118 node distribution system is used to verify the applicability and effectiveness of the Coordination Planning Model of EV charging station and distribution network.
What problem does this paper attempt to address?