Parametric modeling and application of tunnel based on BIM
Yongzhu Zheng,Shicheng Zheng
DOI: https://doi.org/10.1007/s12008-022-00942-w
2022-07-15
International Journal on Interactive Design and Manufacturing
Abstract:Today, with the development of modernization, the concept of intelligence has already entered our life, with the exception of the Construction Department of tunnel engineering. BIM Technology has long been widely used in various construction projects. However, up to now, China's internal BIM Technology is still in the preliminary stage. It is mostly used for basic applications such as visual modeling and implementation, pipeline collision detection, collaborative design and pipeline synthesis. Some of them also use BIM parametric technology to solve certain problems, However, there are still few examples of applying BIM parameterization technology in tunnel engineering projects. The purpose of this paper is to study the tunnel parametric modeling and application based on BIM. Taking BIM Technology as the research focus, this paper attempts to model the software design with BIM Technology, analyzes the experience and analysis of software modeling function, human–computer interaction and other functions, as well as the implementation of parameterization with BIM Technology, and designs a three-dimensional tunnel modeling method, which can not only help designers establish efficient and concise tunnel model. It not only makes the staff better understand the real-time situation inside the tunnel, but also makes it more convenient for the managers of the tunnel project to supervise and change the plan on the construction progress of the tunnel, which reduces the human risk of disasters caused by design or construction errors, but also reduces the casualties in case of disasters and improves the construction efficiency. According to the experimental research, based on the data in the BIM based tunnel parametric modeling proposed in this paper, it is calculated that the parking distance of drivers entering in the tunnel lighting environment changes with the steepness of vehicle speed and slope. When driving at a speed of about 40 km/h, it takes about 24 m to enter the tunnel for emergency stop. The design of the tunnel can be adjusted based on the change of BIM parameters.