Modeling Real-Time Scheduling Problem Schedulability Test In Qcsp

Ju-Yang Zhang,Tian-Ming Bu,Yi-Xiang Chen
2013-01-01
Abstract:In such as Real-time Scheduling Problems with uncertain interrupt operation, Quantified Constraint Satisfaction Problems were introduced to model and solve Constraint Satisfaction Problems involving uncertainty or uncontrollability on the value taken by some variables. In the former work, we propose to transform the schedulability test into the satisfability problem. In this paper, we analysis and model the Quantified Constraint (QC) of the preemptive real-time scheduling problem with interrupt. With the input data QC of schedule valid(S) and interrupt in the real-time scheduling system, the algorithm QCSP-SchTest for judging the satisfability of a schedule S could be implemented. This leads to a new schedulability test method without considering the specific scheduling algorithm or strategy.
What problem does this paper attempt to address?