Water-energy Nexus under Uncertainty: Development of a Hierarchical Decision-Making Model

Y. Ma,Y. P. Li,G. H. Huang,Y. R. Liu
DOI: https://doi.org/10.1016/j.jhydrol.2020.125297
IF: 6.4
2020-01-01
Journal of Hydrology
Abstract:In this study, an interval stochastic bi-level programming (ISBP) method is developed for planning the water-energy nexus (WEN) system. In ISBP, interval-parameter programming (IPP) and two-stage stochastic programming (TSP) are introduced into a bi-level programming (BP) framework. ISBP can tackle dual uncertainties expressed as probability distributions and interval values as well as balance the tradeoff between two-level decision makers. An ISBP-WEN model is then formulated for planning the WEN system of Jinan (the capital of Shandong province, China), in which the upper-level model aims to maximize system benefit and the lower-level model aims to minimize the electricity consumed for water allocation. Major findings are: (i) dual uncertainties can affect the city's water-allocation pattern and lead to different amounts of water shortage and electricity consumption; (ii) [25.5, 31.3]% of water-allocation target cannot be satisfied under the low water-flow level, implying that the city would face serious water shortage; (iii) compared with surface water and reclaimed water, groundwater is the scarcest source for the city and the proportion of groundwater deficit would be [41.2, 49.9]% under the low water-flow level; (iv) compared with the traditional single-level model, electricity consumption from ISBP-WEN would be reduced by [3.9, 5.1]%. These findings can help managers to identify the desired strategy between different stakeholders and provide numerical information for planning the WEN system under dual uncertainties.
What problem does this paper attempt to address?