Maintenance Strategy of Performance-Based Concrete Bridges in Life Cycle
Xiang Yiqiang,Wu Qiangqiang
DOI: https://doi.org/10.3969/j.issn.1674-0696.2013.05.05
2013-01-01
Abstract:As far as the reinforced concrete and PC bridge was concerned,some existing problems in planning design,construction,operation and maintenance of concrete bridges were analyzed,such as insufficient load bearing capacity caused by uneven settlement of piers in bridges,horizontal displacement,temperature change,overload,the low design load level in original bridge design,shrinkage and creep of concrete and poor durability and performance degradation of concrete structures caused by chloride permeability,steel bar corrosion,carbonization and cover spalling of concrete,long-term deflection and cracking of main girder,the rain leakage and corrosion of concrete.From the aspects of safety,applicability,durability,economy,environmental protection and the sustainability of structure in the life cycle,the maintenance objectives,performance level,and corresponding strategies and methods of performance-based bridge were explored and discussed.