Feasibility Analysis of Canceling Reheating after Condensation Dehumidification in Semiconductor Cleanrooms

Jiawen Yin,Tao Zhang,Zhiyao Ma,Xiaohua Liu
DOI: https://doi.org/10.1016/j.jobe.2021.102589
IF: 7.144
2021-01-01
Journal of Building Engineering
Abstract:Cold-heat offset problem occurs due to reheating after condensation dehumidification in the make-up air unit (MAU) of semiconductor cleanrooms. This study conducted on-site measurement and analyzed the indoor thermal balance in five tested factories A-E. Based on the measured results, this study focuses on the feasibility analysis of canceling reheating to avoid cold-heat offset. It is indicated indoor condensation will not be caused in the cleanrooms. Indoor subcooling is determined by air change rates of outdoor air (A(a)) and supplied indoor air (A(s)), and heat dissipation of indoor equipment (Q(in)). The larger A(a), the less A(s) and the less Q(in )the more likely indoor subcooling will be caused. When Q(in) is 0-100 W/m(2), 100-200 W/m(2) and larger than 200 W/m(2), the requirement range of A(a) to avoid indoor subcooling is 7-21/h, 12-26/h and 20-26/h respectively. It is concluded that canceling reheating is possible when factories A-D is within the operating parameters. In factory E, canceling reheating is impossible since indoor subcooling is unavoidable. The performance and energy saving potential of the proposed system which cancels reheating are then analyzed. Compared with the conventional system, the required cooling capacity and heating capacity are both decreased, and the energy saving ratio of the proposed system is 10.4%-38.3%.
What problem does this paper attempt to address?