Scheduling With Position-Dependent Weights, Due-Date Assignment And Past-Sequence-Dependent Setup Times

Li-Yan Wang,Xue Huang,Wei-Wei Liu,Yu-Bin Wu,Ji-Bo Wang
DOI: https://doi.org/10.1051/ro/2020117
2021-01-01
RAIRO - Operations Research
Abstract:In this study, we consider single-machine scheduling problems with past-sequence-dependent (denoted by psd) setup times in which the setup times of jobs are proportional to the length of already processed jobs. Under common (CON) and slack (SLK) due-date assignment methods, we prove that the weighted sum of earliness, tardiness and due-date minimization remains polynomially solvable. We also give some extensions for the scheduling problems with psd setup times.
What problem does this paper attempt to address?