Thermal power plant time sequence variable abnormity monitoring method and system

Wang Jiandong,Wang Zhen,Yang Zijiang,Zhou Donghua
2019-01-01
Abstract:The invention discloses a thermal power plant time sequence variable abnormity monitoring method and system. The method comprises the steps of collecting time sequence data of thermal power plant analog signal monitoring variables; taking the whole time sequence data as an initial optimal PLR segment, calculating a decision coefficient of the optimal PLR segment, and taking the whole time sequencein the historical sample data as a first-layer original data segment; segmenting the original data segment to form two new data segments, and respectively calculating decision coefficients of the twonew data segments; judging whether the segments are allowed or not, and if yes, continuing to segment the segments; and judging whether the segmentation is finished or not to obtain the optimal PLR segmentation number. According to the method, the optimal segment number of the PLR is determined through a coefficient determination method, and the problems that an L method highly depends on a fitting error and left and right points in a time sequence are solved.
What problem does this paper attempt to address?