Research on the Optimal Operation of Integrated Energy Station Considering Auxiliary Equipment

Xuekun Jin,Jinghong Zheng,Wenzhi Zhao,Zonghang Han,Yuke Gui
DOI: https://doi.org/10.1109/ei250167.2020.9346860
2020-01-01
Abstract:Cooperating optimization of Multi-energy systems have been paid more and more attentions in recent years. This paper focuses on the optimal operation of a CCHP integrated energy station. An optimization model considering the on/off linkage of auxiliary equipment consumption is proposed. The models of the main equipment in the energy station, such as LiBr absorption chiller, ground source heat pump, gas boiler, electric chiller, etc. are improved with piecewise linear method to get more precise description of efficiency curve. The operation cost and exergy efficiency are introduced as the evaluation indexes for the operation of CCHP integrated energy station. The simulation cases are presented to investigate effect of the proposed model compared with the traditional model. The results show the proposed model in this paper could get lower operation cost and higher efficiency than the traditional one.
What problem does this paper attempt to address?