Model and Algorithm on the Scheduling Problem Coordinated on Coal Production System

Ning MA,Zhi-li ZHOU,Song JIU
DOI: https://doi.org/10.3969/j.issn.1007-5429.2015.06.013
2015-01-01
Abstract:Coal production was complicated and sequential,which included three consecutive stages,viz.coal mining stage,coal lifting stage,and coal loading stage.Each stage was composed of different equipment that needs maintenance each day.In practice,maintenance scheduling was usually conducted by the scheduling staff based on their experience,and executed independently in separate stages.Extra machines shutdown and failures of truck loading frequently occurred,for reason of raw coal and ground coal warehouse.This paper investigated the coordination scheduling problem in a coal production system in perspective of the system itself.We proposed a hybrid genetic algorithm to solve it.The method was tested on a practical coal enterprise in China. Computational results indicate the algorithm can solve the scheduling problem efficiently.
What problem does this paper attempt to address?