An Exact Epsilon-constraint Algorithm for the Bi-objective Optimization Problem of Scheduling Staple Fiber Production

Fei-feng ZHENG,Jun-kai HE,Ming LIU
DOI: https://doi.org/10.12005/orms.2018.0053
2018-01-01
Abstract:This paper studies the scheduling problem of staple fiber production with successive orders, which considers the demand and due date differences between clients and the setup time of machine when switching components.Firstly, we establish a bi-objective integer linear programming model so as to minimize the total tardiness of orders and total setup time of machine.Then, we conduct an accurate algorithm to get the precise solutions of proposed model, i.e., Pareto frontier.Finally, we NSGA-II to sovle this model within a devise substantial amount of time.Simulation experiments prove the correctness and effectiveness of this model and proposed algorithms,which can be considered to use as an reference in daily process.
What problem does this paper attempt to address?