4D construction information model for core rock-fill dam and its application

Denghua ZHONG,Xiaoxu JIA,Chengbo DU,Bo CUI,Bingyu REN,Binping WU
DOI: https://doi.org/10.3876/j.issn.1000-1980.2017.02.001
2017-01-01
Abstract:In order to realize the dynamic and visual integration of multi-source construction information,including quality,schedule,and cost,and to meet the need for visually analyzing the whole construction process of a core rock-fill dam,a 4D construction information model for a core rock-fill dam (3D geometric model+time dimension+multi-source construction information) is proposed based on analysis of the multi-source characteristics of the construction information.The established method of the 4D construction model was studied,including techniques for the establishment of a 3D model of the core rock-fill dam,the integration of the multi-source construction information,and the 4D visualization method in the construction process of the rock-fill dam.Practical engineering applications show that the integration and interactive analysis of multi-source information and 4D visualization of the construction process are realized based on 3DGIS,which can provide theoretical and technical support for site control and management of the rock-fill dam.
What problem does this paper attempt to address?