Fast start-up of EBPR and its coupling with simultaneous nitrification-denitrification to achieve sewage nutrient removal

Xiaoxia Wang,Shuying Wang,Yongzhen Peng,Dongchen Weng,Xian Dai
DOI: https://doi.org/10.3969/j.issn.1001-0505.2014.06.032
2014-01-01
Abstract:In order to know the phosphorus and nitrogen removal characteristics of an enhanced bio-logical phosphorus removal (EBPR)system when dealing with domestic sewage,the EBPR system, which was inoculated with activated sludge in a SBR,was fast started up by gradually increasing the influent COD(chemical oxygen demand)concentration,combined with short sludge retention time control.The nitrogen and phosphorus removal characteristics of the EBPR after being started up were also studied.Experimental results showed that when the influent COD concentration is gradually in-creased from about 200 mg/L to about 500 mg/L,the EBPR system could be started up in 29 d. The effluent PO3-4 -P concentration remaines below 0. 5 mg/L in the following 30 d,and the average phosphorus removal efficiency reaches 99. 4%.Additionally,this system can be efficiently and stab-ly used for long to deal with high phosphorus wastewater (containing PO3-4 -P of 40 mg/L).After the successful start-up of the EBPR system,phosphorous accumulating organisms (PAOs)become the dominant bacteria which accountes for 34%± 3% of total biomass.However,these also exist nitrifying and denitrifying bacteria,and glycogen accumulating organisms (GAOs)as well.Moreo-ver,during the stable operation phase of the EBPR system,simultaneous nitrification and denitrifica-tion (SND)are detected at the aerobic stage,coupling with the phosphorous uptake process of PAOs.The SND process leads to an average total inorganic nitrogen loss (TIN)of 7. 6 mg/L and a total nitrogen (TN)removal efficiency of about 70%.Phosphorus removal coupling with SND with-in the EBPR system can achieve the nitrogen and phosphorous removal in wastewater treatment.
What problem does this paper attempt to address?