Comparative analysis of several types of vertical wheel/rail relationship and construction of an improved iteration model for train-track-bridge system

ZHU Zhihui,WANG Lidong,GONG Wei,YU Zhiwu,CAI Chengbiao
DOI: https://doi.org/10.11817/j.issn.1672-7207.2017.06.023
2017-01-01
Abstract:The influence of three types of wheel,i.e.rail contact model-nonlinear Hertz contact,linear Hertz contact and rigid contact on the dynamical analysis result of train-track-bridge vertical coupled system were compared,and an improved iteration model for train-track-bridge coupled system was established.The vehicle model was established by multi-body system dynamics and the track-bridge model was established by finite element method.Depending on different wheel-rail contact models,the corresponding wheel-rail force calculation formulas were established,and the iterative method were used to calculate the coupled system vibration.In numerical case,taking a high-speed train traveling across a five-span simply supported beam bridge for case study,the calculation results of train-track-bridge coupled vibration withr different wheel-rail contact models were compared.Aiming at the problem of low efficiency of the iterative computation model for the traditional train-track-bridge coupled system,an improved iteration model was established.The results show that the vehicle body acceleration,wheel-rail force,displacement and acceleration of the rail and bridge of the linear Hertz contact model are in good agreement with those of the nonlinear Hertz contact model,but the computational efficiency is lower than that of the latter;rigid contact model which neglects the inertia force of the wheel is unable to obtain accurate rail and bridge acceleration.The improved model is to improve the iterative stability of the vehicle subsystem by establishing the vehicle model including the wheel-rail contact spring.The calculation efficiency of improved model is about 7 times greater than that of the conventional model.In order to ensure the accuracy of results,the iterative calculation in the time step should be taken into account in the calculation of train-track-bridge coupled vibration.
What problem does this paper attempt to address?