Optimization of deep excavation construction using an improved multi-objective particle swarm algorithm
Fanli Meng,Jiayi Xu,Changqing Xia,Wei Chen,Min Zhu,Chuanqing Fu,Xiangsheng Chen
DOI: https://doi.org/10.1016/j.autcon.2024.105613
IF: 10.3
2024-07-19
Automation in Construction
Abstract:Managing construction uncertainties, especially those affecting safety and the environment, is critical in optimizing deep excavation projects. This paper introduces an integrated framework that leverages Building Information Modeling (BIM) to aggregate essential data on construction cost and duration. A multi-objective optimization model is proposed, incorporating the critical path method, system reliability metrics, reward-penalty mechanisms, and environmental impact considerations to balance the objectives of duration, cost, safety, and environment. An improved Multi-Objective Particle Swarm Optimization (MOPSO) algorithm is applied to solve this complex problem. The effectiveness of this algorithm is demonstrated through statistical tests, showing a significant improvement in the solution quality and a reduction in the mean square error of particle density distance by over 85%. A case study from a project in Hangzhou, China, illustrates the practical application of this method, achieving compliance with safety and environmental regulations while reducing the duration by 22 days and saving over €28,350.
construction & building technology,engineering, civil