Build a general analysis system for prediction of cost and benefit of a medical equipment project

Bin LI,Hong-yan ZHANG,Sheng-hao CAI
DOI: https://doi.org/10.3969/j.issn.1674-1633.2005.05.017
2005-01-01
Abstract:This paper uses the NPV and two points method to build a general analysis system for prediction of cost and benefit of a medical equipment project.
What problem does this paper attempt to address?