Construction scale and demonstration of silt-arresting dams depending on grain demands in the Loess Plateau

Da-chuan RAN,Zheng-gao WANG,Jian-jun HU,Yong MA,Xiao-ming PANG
DOI: https://doi.org/10.3321/j.issn:1000-7601.2005.02.028
2005-01-01
Abstract:The paper demonstrates the construction scale of the silt-arresting dams in the loess plateau mainly depending on its grain demands, total incoming sediment and constructive capacity, pointing out that by 2020 ten million silt-arresting dams will have been built, and of them twenty seven thousand dams will be backbone dams and one hundred and thirty six thousand dams will be silt-arresting dams for farmland; by 2020 four hundred and ninety five thousand hectares of newly built farmland will have been added, two point nine seven million of steep farmland, 36% of the total of eight point two three million slope farmland in the region in 2000, will have been withdrawn from farming. Therefore, the objectives to build silt-arresting dams for farmland to 2020, put forward in the plan to build silt-arresting dams for farmland in the Loess Plateau, are feasible and practical.
What problem does this paper attempt to address?