Risk Management of International Construction Projects During the Project Life Cycle

Qiang LIU,Li GUAN
DOI: https://doi.org/10.3969/j.issn.2095-0985.2017.06.001
2017-01-01
Journal of Civil Engineering and Management
Abstract:The number of international construction projects assumed by Chinese construction companies has increased dramatically with the implementation of the Belt and Road strategy. Due to a variety of risks in the process of international construction projects, risk management is becoming a matter of paramount importance to ensure the completion of projects successfully. In order to reduce the adverse effects of risk to the international construction projects and improve the validity of risk management, this paper provided guidelines for the selection of risk management techniques based on the life cycle and special characteristics of international construction projects and the risk management process. Using risk breakdown structure to identify the critical risk factors of projects and applying fuzzy analytical hierarchy process to risk assessment were mainly discussed. At the same time, a risk management dynamic model based on the life cycle of international construction projects was established. In the case study, all critical risk factors were identified in Ankara-Istanbul high-speed railway project in Turkey from the project life cycle perspective by means of proposed risk management dynamic model, so that the project risk level was evaluated according to the risk assessment index system. As a result, this case study verified the feasibility of the risk management model in practical work. The research findings of this paper will provide useful suggestions to local construction companies when they complete international construction projects and refine risk management system in the future.
What problem does this paper attempt to address?