Scheduling of Public Bicycle during Peak Period Based on the Customer Reservation Data

Wenzhou JIN,Qinhai YE,Xiaoni HAO
DOI: https://doi.org/10.3969/j.issn.1674-0696.2017.10.15
2017-01-01
Abstract:The issues of scheduling delay and low customer satisfaction caused by the lack of demand forecast during peak period and the concept of systematic scheduling in the public bicycle system were analyzed.The quantization method of scheduling demand forecast and system average satisfaction of the public bicycle during peak period was discussed;the optimal routing of the public bicycle scheduling was also analyzed.According to the analysis on the scheduling demand forecast model based on the customer reservation data during peak period,the optimal scheduling model to minimize the comprehensive scheduling costs with considering the customer satisfaction level was established,and then an improved Genetic Algorithm was adopted to solve the proposed model.Finally,a case study of the public bicycle system at certain area in Guangzhou was cited to verify the proposed model.Research results show that,compared with the conventional scheduling plan,the comprehensive cost of the proposed model is reduced by 16.6% and the system average customer satisfaction is improved by 28.7%.
What problem does this paper attempt to address?