Decision Model of Critical Peak Pricing Considering Wind Power to Be Integrated

Qiang CUI,Xiuli WANG,Lun TANG,Xiangkun DING
DOI: https://doi.org/10.3969/j.issn.2095-6649.2014.06.010
2014-01-01
Abstract:Propose solution responses to the difficulty of peak regulation and lack of peak power, we aim at improving the ability of accepted wind power and reducing the wind was forced to discard. The decision model time-variable critical peak pricing is established after having comprehensive considerations,including the interests of the wind farms,power users and power supply company. Monte Carlo simulation to wind speed and the improved genetic algorithm are used to create the model. The method effectively cut down the critical peak load of the system and improving the ability of accepted wind power. It is a win-win solution,the wind was forced to discard by wind farm is reduced,wind energy resources is utilized efficiently,the average power purchase price of users is lowered,and the profit of power supply company is increased.
What problem does this paper attempt to address?