Targeted Numerical Simulation Study on the Stability of Tunnel Surrounding Rock Based on Advanced Geology Forecast

Qilong DONG,Yujun ZUO,Zhuoran YANG,Jingyuan HE
DOI: https://doi.org/10.13827/j.cnki.kyyk.2018.08.022
2018-01-01
Abstract:Aiming at the shortcomings of TSP advanced geology forecast technology, the careful analysis of reflected wave information was conducted.Then, combined with geological survey data and on-site construction conditions, the some mechanical parameters of rock mass in front of the tunnel were obtained by TSP reflection information.After that, the targeted numerical simulation calculation on the stability of tunnel surrounding rock was conducted.And the displacement characteristics, plastic zone distribution and pore water pressure distribution of surrounding rock were compared and analyzed under different construction methods.The results showed that compared with two-step method, three-step method used for construction had the advantages of small vault subsidence, headroom convergence and plastic zone distribution.However, the displacement change of surrounding rock under the construction of two-step method was also within allowable scope of criterion, and the surrounding rock condition was stable.Therefore, the study had a certain reference value for the construction method transformation at the high-risk section of tunnel and the advanced analysis of surrounding rock stability.
What problem does this paper attempt to address?