Principle and Algorithm of Virtual Workshop Scheduling Based on Multi-Agent Technology

郭文胜,殷国富,胡晓兵
DOI: https://doi.org/10.3321/j.issn:1004-132x.2001.12.030
2001-01-01
Abstract:In this paper, based on the analysis of the characteristics of Workshop Production and Control, we think that the basic factor, resource and item can be wrapped in the agent respectively. A model of virtual workshop scheduling cell based on the Multi-Agent technology is presented, thus, a new GA algorithm of the model is designed. It is proved that the model is simple and fast running, and is fit for the problem of multi-items being scheduled in multi-virtual-workshop.
What problem does this paper attempt to address?