Abstract:Based on the data of East China, several prevailing methods for reserve capacity evaluation of generating systems are compared and the limitations of the deterministic method currently adopted by the East China Grid are pointed out. The reserve level of East China Grid in 2003 is evaluated by analytic method and Monte Carlo simulation method respectively. A comparison of the results shows that for the East China Grid, lack of reserve capacity is the main problem faced. Finally, some factors during reliability index calculation are discussed and suggestions are made.
What problem does this paper attempt to address?