Load optimal distribution for double extraction cogeneration unit based on comprehensive economic cost index
Yu ZHU,Qianjun LI,Yongxin FENG,Yousheng LIN,Yanfen LIAO,Xiaoqian MA
DOI: https://doi.org/10.3969/j.issn.1002-3364.2014.07.015
2014-01-01
Abstract:On the basis of obtaining the security power generation feasible interval of cogeneration unit with double extraction,a multi-obj ective,multi-constrained optimization model was established,taking the coal consumption for power generation,environmental performance and load dispatch speed as the multiple tar-gets.The advantages of ergodicity and randomness of chaotic motion were applied to build hybrid genetic algorithm,on the basis of the chaotic variable step length-gradient descent.Then,the cogeneration heat/e-lectricity load distribution was optimized,and by introducing penalty factor into constraints of the obj ective function,the fitness function was determined.The example calculation results show that:the above model not only effectively met the power grid requirement of load dispatch speed,but also reduced the unit com-prehensive cost,which improved the comprehensive competitiveness of unit load and provided a scientific basis for load dispatch.