Construction and Simulation Research on the Speed Parts of the Hardware in the Loop Simulation Platform for a Heavy-duty Gas Turbine

Yue LIU,Hongde JIANG,Qing GUO,Yuzhu HUANG
DOI: https://doi.org/10.3969/j.issn.1009-2889.2016.01.003
2016-01-01
Abstract:In order to validate the control logic and performance for the control system of heavy-duty gas turbine, the construction work of simulation testing platform based on hardware in the loop( HIL) is necessary.Firstly, we set up a high precision mathematical model for heavy-duty gas turbines;secondly, we built the speed parts of HIL in the way of frequency converter driving motor.By comparing the experimental results of pure digital simulation with HIL simulation, we modified the control system and get a better control perform-ance.Since the principle of building HIL is to simulate the real situation of power plant, the optimization process for control system in this article also applies for commissioning debugging, which has certain guidance in the future for shortening the debug cycle test, sav-ing expenditure and reducing the risk , etc.
What problem does this paper attempt to address?